Our solar installation process in Kenya

Eight steps, from first site visit to after-sales support. Version 1.0, residential solar systems.

Objective: To provide a clear, safe, and professional process for installing a solar photovoltaic (PV) system at a client’s residence.

01

Site Assessment & Energy Audit

  • Conduct home visit or virtual assessment.
  • Collect electricity consumption and assess client needs.
  • Roof & electrical inspection.
Deliverables: Load assessment report & quotation.
Technician carrying out a solar site assessment and energy audit at a home
02

System Design & Proposal

  • System sizing & component selection.
  • Prepare Bill of Materials (BOM) & layout diagram.
Deliverables: Quote, BOM, layout.
Solar system design and layout being prepared
03

Contract Signing & Payment

  • Client signs agreement & pays 60–70% deposit.
Deliverables: Signed contract, invoice & installation schedule.
Client signing a solar installation contract
04

Procurement & Preparation

  • Purchase approved equipment & inspect quality.
  • Pre-configure inverter and accessories where applicable.
Deliverables: Quality inspection checklist.
Solar panels, inverter and batteries prepared for installation
05

On-Site Installation

  • Safety briefing and isolation of power.
  • Install mounting structure (roof or ground).
  • DC and AC wiring, inverter & battery installation.
  • Install protection devices (breakers, surge protection, fuses).
Deliverables: Installation quality checklist.
Technicians installing solar panels on a roof
06

Testing & Commissioning

  • Perform full system test & calibration.
  • Confirm power output, charging and backup performance.
Deliverables: Commissioning report.
Technician testing and commissioning a solar inverter
07

Client Training & Handover

  • Train client on basic operation, safety and system care.
  • Hand over documentation & activate warranty.
Deliverables: User manual, warranty documents.
Solar monitoring app shown to a client during handover training
08

After-Sales Support & Maintenance

  • Follow up with client within 72 hours of commissioning.
  • Offer scheduled maintenance and support package.
Deliverables: Service log & maintenance record.
Haq Power after-sales support team in Kenya

Warranty Summary

10–25 yrs Panels
2–5 yrs Inverter
3–10 yrs Batteries
1 yr Workmanship